Academic Year:
2011
Supervisors:
Sameer Abu Eisheh Students:
Jehad Ahmad Jallad
Mohammad Takrouri
Mohammad Al-Dana
Department:
Civil Engineering Files:
This Graduation Project Report consists of a number of chapters. The first chapter is the introduction, where the project problem and objectives are illustrated. The methodology and the reconnaissance visits are presented in Chapter Two, which includes also a presentation of the data collection, and covers the types of data. Chapter Three illustrate the study area (intersections), data collection which include traffic volumes (peak hour and calculations). The Traffic problems and analysis are shown in Chapter Four, which present all data analysis and calculations. Chapter Five includes all intersections design, whether related to geometric improvement and traffic control. Conclusion and Recommendations are included in Chapter Six.